Screenshot 2015-11-12 23.22.23 ← Previous Next → Spoiler: Drobo 3rd gen rebuilt in 12 hours what 2nd gen took 120 hours to do. (* Not 100% fair since I was moving a second 3TB drive in, but it’s good enough for a reference point.)